Skip to content
Region System
06 · Services

Underground Infrastructure

Route survey, trenchless crossings under rivers, railways and highways, HDPE duct systems and chambered access — built so it can be re-entered in 2050 without excavating a city.

2 100km/year

Capabilities

01

Horizontal directional drilling up to 600 m per shot

02

Multi-duct corridors with capacity reserved for third parties

03

As-built GIS handover with sub-metre accuracy

Specifications

Depth1.2 m standard, 2.0 m under carriageway
DuctHDPE 40/33, warning tape, marker posts
AccessChamber every 500 m

Typical clients

  • Government
  • Transport & railways
  • Smart cities

Reference specification

Standard fibre count288 F
Fibre gradeG.652.D / G.654.E
Burial depth1.2 m — 2.0 m
Chamber interval500 m
Splice tolerance≤ 0.05 dB
Span attenuation≤ 0.21 dB/km
Protection switching< 50 ms
Design capacity96 Tbps
09Next

Tell us what you need to build.

A route, a capacity, a deadline, a regulatory constraint. We will tell you what it takes — in engineering terms, before commercial ones.