Skip to content
Region System
Construction

Two thousand kilometres a year, in a country of extremes.

From −45 °C in the northern winter to +45 °C on the southern steppe. The method changes with the ground; the tolerances never do.

Field capability

24

Directional drilling rigs

38

Cable-blowing sets

46

Splice trailers

19

Survey teams

2 100 km

Annual build rate

640 km pre-positioned

Restoration stock

Construction

Safety

Every person on a Region System site is trained, equipped and accounted for. Excavation near live utilities is the most dangerous thing we do, and it is governed accordingly: detection before digging, no exceptions, no schedule pressure that overrides it.

Construction

Restoration

Cable is cut by excavators, floods and — occasionally — by people who want the metal that is not in it. Restoration crews and cable are pre-positioned so that the backbone target is eight hours, not eight hours plus travel.

09Next

Tell us what you need to build.

A route, a capacity, a deadline, a regulatory constraint. We will tell you what it takes — in engineering terms, before commercial ones.