Everything Region System operates resolves into four physical layers. Each has a different lifespan, and each is engineered to the longest one.

The stack

50 years

Corridor

Right-of-way, trench, chambers and crossings. The hardest thing to acquire and the last thing anyone should have to rebuild.

40 years

Duct

HDPE subduct with reserved ways. Capacity for cables that have not been invented yet.

25 years

Cable

Up to 288 fibres, blown in two-kilometre sections and certified span by span.

7 years

Transport

Optics and electronics — the only layer designed to be replaced, and the reason the other three must not be.

Reference specification

Standard fibre count288 F
Fibre gradeG.652.D / G.654.E
Burial depth1.2 m — 2.0 m
Chamber interval500 m
Splice tolerance≤ 0.05 dB
Span attenuation≤ 0.21 dB/km
Protection switching< 50 ms
Design capacity96 Tbps
Infrastructure

Resilience

Diversity is a geographic property, not a diagram. Two paths are only diverse if they share no trench, no bridge, no tunnel, no substation and no maintenance crew. We verify this in GIS before we call anything protected.

National network

One country. One continuous system.

Every core node, cross-border gateway and data centre on the backbone. Select a node to inspect its role in the topology.

Interactive map of the national networkA map of Kazakhstan showing core network nodes, metro nodes, cross-border gateways, data centres and the fibre spans connecting them. A text list of all nodes follows.ASTANAALMATYSHYMKENTKARAGANDAAKTOBEATYRAUAKTAUKOSTANAYPAVLODAROSKEMENKYZYLORDATARAZORALPETROPAVLKHORGOSDOSTYKSARYAGASHKORDAI
Core nodeMetro nodeBorder gatewayData centreBackbone spanProtection ring

Node register

  • Astana Core, In service since 2009. Adjacent nodes: Kokshetau, Ekibastuz, Temirtau, Arkalyk, Karaganda.
  • Almaty Core, In service since 2008. Adjacent nodes: Konayev, Taldykorgan, Khorgos, Taraz, Kordai.
  • Shymkent Core, In service since 2011. Adjacent nodes: Taraz, Saryagash, Turkistan.
  • Karaganda Core, In service since 2010. Adjacent nodes: Temirtau, Balkhash, Astana.
  • Aktobe Core, In service since 2012. Adjacent nodes: Oral, Kostanay, Kyzylorda, Atyrau.
  • Atyrau Core, In service since 2013. Adjacent nodes: Beyneu, Oral, Aktobe.
  • Aktau Gateway, In service since 2016. Adjacent nodes: Beyneu, Zhanaozen.
  • Kostanay Core, In service since 2013. Adjacent nodes: Aktobe, Kokshetau, Arkalyk.
  • Pavlodar Core, In service since 2011. Adjacent nodes: Ekibastuz, Semey, Petropavl.
  • Oskemen Core, In service since 2014. Adjacent nodes: Semey, Dostyk.
  • Kyzylorda Core, In service since 2014. Adjacent nodes: Zhezkazgan, Turkistan, Aktobe, Beyneu.
  • Taraz Core, In service since 2012. Adjacent nodes: Almaty, Kordai, Shymkent.
  • Semey Metro, In service since 2015. Adjacent nodes: Pavlodar, Oskemen.
  • Oral Gateway, In service since 2015. Adjacent nodes: Aktobe, Atyrau.
  • Petropavl Gateway, In service since 2014. Adjacent nodes: Kokshetau, Pavlodar.
  • Turkistan Metro, In service since 2019. Adjacent nodes: Shymkent, Kyzylorda.
  • Kokshetau Metro, In service since 2016. Adjacent nodes: Kostanay, Petropavl, Astana.
  • Taldykorgan Metro, In service since 2017. Adjacent nodes: Dostyk, Almaty, Khorgos.
  • Zhezkazgan Metro, In service since 2018. Adjacent nodes: Arkalyk, Balkhash, Kyzylorda.
  • Balkhash Metro, In service since 2017. Adjacent nodes: Karaganda, Konayev, Zhezkazgan.
  • Ekibastuz Metro, In service since 2016. Adjacent nodes: Astana, Pavlodar.
  • Temirtau Metro, In service since 2015. Adjacent nodes: Astana, Karaganda.
  • Konayev Metro, In service since 2021. Adjacent nodes: Balkhash, Almaty.
  • Beyneu Metro, In service since 2018. Adjacent nodes: Kyzylorda, Aktau, Atyrau.
  • Zhanaozen Metro, In service since 2019. Adjacent nodes: Aktau.
  • Arkalyk Metro, In service since 2020. Adjacent nodes: Astana, Zhezkazgan, Kostanay.
  • Khorgos Gateway, In service since 2013. Adjacent nodes: Taldykorgan, Almaty.
  • Dostyk Gateway, In service since 2012. Adjacent nodes: Oskemen, Taldykorgan.
  • Saryagash Gateway, In service since 2015. Adjacent nodes: Shymkent.
  • Kordai Gateway, In service since 2016. Adjacent nodes: Almaty, Taraz.
09Next

Tell us what you need to build.