Delivered into service.
A selection of corridors, rings, crossings and facilities. Each entry links to the nodes it touches on the national map.
- 2024International
Trans-Caspian Corridor
A western trunk from the Caspian shore to the Ural valley, giving the country a third international direction that does not transit a northern neighbour.
- Role
- Design, civil works, cable, commissioning
- Adjacent nodes
- Aktau · Beyneu · Atyrau
Scale
1 180km
- 2023International
Khorgos Gateway
Capacity expansion at the principal eastern land crossing, with disjoint approach routes from Almaty and Taldykorgan.
- Role
- Route diversity, transport, operations
- Adjacent nodes
- Khorgos · Almaty · Taldykorgan
Scale
32Tbps
- 2022Metro
Astana Metro Ring
A collapsed dual ring around the capital with two diverse entries into every government facility on the path.
- Role
- Metro design, duct, FTTx distribution
- Adjacent nodes
- Astana · Temirtau · Karaganda
Scale
612km
- 2021Backbone
Steppe Spine
A central trunk across 1 430 kilometres of low-population steppe, closing the ring between the north and the south.
- Role
- Survey, HDD crossings, cable, certification
- Adjacent nodes
- Arkalyk · Zhezkazgan · Kyzylorda
Scale
1 430km
- 2020Civil works
Mangystau Energy Link
Telemetry-grade fibre serving oil and gas facilities on the peninsula, engineered for salt, sand and thermal cycling.
- Role
- Civil works, cable, sensing
- Adjacent nodes
- Aktau · Zhanaozen · Beyneu
Scale
340km
- 2019Metro
Almaty FTTx Programme
Open-access in-building infrastructure across 218 000 homes, lit by four competing operators on the same glass.
- Role
- Metro rings, building entry, distribution
- Adjacent nodes
- Almaty · Konayev
Scale
218k homes
- 2018Backbone
Rail Telemetry Backbone
Corridor fibre along 2 260 kilometres of main line, carrying signalling, dispatch and lineside surveillance.
- Role
- Corridor design, duct, transport
- Adjacent nodes
- Petropavl · Astana · Shymkent
Scale
2 260km
- 2025Data centre
Sovereign Data Platform
Three data halls placed directly on backbone nodes, with 18 MW of contracted load and cross-connects to every on-net carrier.
- Role
- Facility delivery, power, carrier neutrality
- Adjacent nodes
- Astana · Almaty · Karaganda
Scale
18MW
8 / 8
Tell us what you need to build.
A route, a capacity, a deadline, a regulatory constraint. We will tell you what it takes — in engineering terms, before commercial ones.