Skip to content
Region System
Projects

Delivered into service.

A selection of corridors, rings, crossings and facilities. Each entry links to the nodes it touches on the national map.

  1. 2024International

    Trans-Caspian Corridor

    A western trunk from the Caspian shore to the Ural valley, giving the country a third international direction that does not transit a northern neighbour.

    Role
    Design, civil works, cable, commissioning
    Adjacent nodes
    Aktau · Beyneu · Atyrau

    Scale

    1 180km

  2. 2023International

    Khorgos Gateway

    Capacity expansion at the principal eastern land crossing, with disjoint approach routes from Almaty and Taldykorgan.

    Role
    Route diversity, transport, operations
    Adjacent nodes
    Khorgos · Almaty · Taldykorgan

    Scale

    32Tbps

  3. 2022Metro

    Astana Metro Ring

    A collapsed dual ring around the capital with two diverse entries into every government facility on the path.

    Role
    Metro design, duct, FTTx distribution
    Adjacent nodes
    Astana · Temirtau · Karaganda

    Scale

    612km

  4. 2021Backbone

    Steppe Spine

    A central trunk across 1 430 kilometres of low-population steppe, closing the ring between the north and the south.

    Role
    Survey, HDD crossings, cable, certification
    Adjacent nodes
    Arkalyk · Zhezkazgan · Kyzylorda

    Scale

    1 430km

  5. 2019Metro

    Almaty FTTx Programme

    Open-access in-building infrastructure across 218 000 homes, lit by four competing operators on the same glass.

    Role
    Metro rings, building entry, distribution
    Adjacent nodes
    Almaty · Konayev

    Scale

    218k homes

  6. 2018Backbone

    Rail Telemetry Backbone

    Corridor fibre along 2 260 kilometres of main line, carrying signalling, dispatch and lineside surveillance.

    Role
    Corridor design, duct, transport
    Adjacent nodes
    Petropavl · Astana · Shymkent

    Scale

    2 260km

  7. 2025Data centre

    Sovereign Data Platform

    Three data halls placed directly on backbone nodes, with 18 MW of contracted load and cross-connects to every on-net carrier.

    Role
    Facility delivery, power, carrier neutrality
    Adjacent nodes
    Astana · Almaty · Karaganda

    Scale

    18MW

8 / 8

09Next

Tell us what you need to build.

A route, a capacity, a deadline, a regulatory constraint. We will tell you what it takes — in engineering terms, before commercial ones.